Sumner Tunnel 40% complete, says MassDOT, but East Boston residents frustrated with exit closure
MassDOT crews say they are 40% done with the work but residents are already fed up with the long drive times, and extra closures surrounding the tunnel. WBZ-TV's Mike Sullivan reports.