First Twin Span Of New Goethals Bridge Opens

ELIZABETH, N.J. (CBSNewYork/AP) -- It's a wrap for the Goethals Bridge.

The 89-year-old span that connects Elizabeth, New Jersey, with Staten Island, New York, closed Friday and be replaced by twin spans.

New York-bound traffic will use the first of the twin spans starting at 4 p.m. Saturday. New Jersey-bound lanes will open at 6 p.m. Sunday.

The second of the twin spans will open in 2018.

The new Goethals Bridge spans will each have three 12-foot lanes along with 12-foot outer shoulders and 5-foot inner shoulders.

The Port Authority of New York and New Jersey says the $1.5 billion cable-stayed crossing is the agency's first new bridge opening since the Bayonne Bridge was completed in 1931.

(© Copyright 2017 CBS Broadcasting Inc. All Rights Reserved. The Associated Press contributed to this report.)

Read more
f

We and our partners use cookies to understand how you use our site, improve your experience and serve you personalized content and advertising. Read about how we use cookies in our cookie policy and how you can control them by clicking Manage Settings. By continuing to use this site, you accept these cookies.