STS-135 Flight Data
Changes and additions:
Table of Contents
Mission Priorities
Flight Plan Walkthrough
Flight Hardware
Shuttle Flight History
Countdown
Ascent Abort Boundaries
Trajectory Summary
Rendezvous Summary
Docking Timeline
Undocking Timeline
Deorbit Opportunities
Entry Timelines
Two-Line Elements
Shuttle Reference Manual
Updated: 07/07/11
Editor's note: The launch window for STS-135 is 10 minutes long, centered on the moment when Earth's rotation carries the launch pad into the plane of the space station's orbit. To optimize ascent performance, NASA targets the "in-plane" time. All times in Eastern.
As with every space shuttle flight, NASA has established a set of mission priorities and defined what is required for minimum and full mission success. Here is the list for STS-135 (source: NASA):
Category 1:
DATE.......WINDOW OPEN...IN PLANE......WINDOW CLOSE..DOCKING/NOTES
Fri 07/08...11:21:46 AM...11:26:46 AM...11:31:47 AM...FD 3
........................................11:35:04 AM...FD 4
Sat 07/09...10:59:15 AM...11:04:15 AM...11:09:16 AM...FD 3
Sun 07/10...10:33:31 AM...10:38:31 AM...10:43:31 AM...FD 3
........................................10:46:45 AM...FD 4
----------------------------------------------------------
NO LAUNCH BETWEEN 07/11-15 DUE TO DELTA 4 LAUNCH CONFLICT
----------------------------------------------------------
Mon 07/11...10:10:58 AM...10:15:58 AM...10:20:58 AM...FD 3
........................................10:24:16 AM...FD 4
Tue 07/12...09:46:34 AM...09:50:16 AM...09:55:16 AM...FD 3
........................................09:56:18 AM...FD 3
........................................09:58:27 AM...FD 4
Wed 07/13...09:22:42 AM...09:27:42 AM...09:32:42 AM...FD 3
........................................09:35:57 AM...FD 4
Thu 07/14...09:00:10 AM...09:05:10 AM...09:10:10 AM...FD 3
Fri 07/15...08:34:28 AM...08:39:28 AM...08:44:28 AM...FD 3
........................................08:47:39 AM...FD 4
----------------------------------------------------------
SHUTTLE LAUNCH WINDOW RE-OPENS AFTER DELTA 4 LAUNCH
----------------------------------------------------------
Sat 07/16...08:11:54 AM...08:16:54 AM...08:21:54 AM...FD 3
........................................08:25:10 AM...FD 4
Sun 07/17...07:49:22 AM...07:54:22 AM...07:59:22 AM...FD 3
Mon 07/18...07:23:39 AM...07:28:39 AM...07:33:39 AM...FD 3
........................................07:36:52 AM...FD 4
Tue 07/19...07:01:06 AM...07:06:06 AM...07:11:06 AM...FD 3
........................................07:14:22 AM...FD 4
Wed 07/20...06:38:34 AM...06:43:34 AM...06:48:34 AM...FD 3
Thu 07/21...06:12:51 AM...06:17:51 AM...06:22:51 AM...FD 3
........................................06:26:04 AM...FD 4
Fri 07/22...05:50:18 AM...05:55:18 AM...06:00:18 AM...FD 3
........................................06:03:36 AM...FD 4
Sat 07/23...05:27:47 AM...05:32:47 AM...05:37:47 AM...FD 3
Sun 07/24...05:02:03 AM...05:07:03 AM...05:12:03 AM...FD 3
........................................05:15:17 AM...FD 4
Mon 07/25...04:39:30 AM...04:44:30 AM...04:49:30 AM...FD 3
........................................04:52:49 AM...FD 4
Tue 07/26...04:18:19 AM...04:18:49 AM...04:23:49 AM...FD 3 **
........................................04:26:59 AM...FD 3
Wed 07/27...03:51:15 AM...03:56:15 AM...04:01:15 AM...FD 3
........................................04:04:30 AM...FD 4
Thu 07/28...03:28:43 AM...03:33:43 AM...03:38:43 AM...FD 3
........................................03:41:08 AM...FD 4
* Two window panes, both for flight day 3 dockings; in-plane
time precedes window open
** Two window panes, both for flight day 3 dockings
Category 2:
Category 3:
Mission........STS-135 flight 135
Orbiter........Atlantis 33rd flight
Atlantis.......282/00:00:28
STS Program....1306/04:00:38 (through STS-134)
Main engines...SSME No. 1: 2047; No. 2: 2060; No. 3: 2045
SRB............Bi146/RSRM 114
External tank..138
OMS pods.......RP01/40; LP04/33
FRCS...........FRC4/33
Software.......OI-34
Pad/MLP........LC-39A/MLP-3
Runway.........33/15, KSC Shuttle Landing Facility
MECO Apo/Per...TBD
OMS-2 Apo/Per..TBD
Rendezvous.....220 sm
Inclination....51.6 degrees
TAL Sites......Zaragoza, Spain; alternate: Moron, Spain, Istres, France
Cryo/N2 tanks..5 PRSD/5 GN2
Payload........Logistics
RMS............301
OBSS...........Yes
Airlock........External
STS-135 Flight Hardware
FLT...#....STS#..DD...HH...MM...SS...Launch.....Mission Notes N/A........51J...00...00...00...00...09/12/85...Flight readiness firing 01...21....51J...04...01...44...38...10/03/85...DOD 02...23....61B...06...21...04...49...11/26/85...3 comsats, EASE/ACCESS 03...27....27....04...09...05...37...12/02/88...DOD (Lacrosse?) 04...29....30....04...00...56...27...05/04/89...Magellan Venus probe 05...31....34....04...23...39...21...10/18/89...Galileo Jupiter probe 06...34....36....04...10...18...22...02/28/90...DOD 07...37....38....04...21...54...31...11/15/90...DOD 08...39....37....05...23...32...44...04/05/91...Gamma Ray Observatory 09...42....43....08...21...21...25...08/02/91...TDRS-5 10...44....44....06...22...50...44...11/19/91...DSP 11...46....45....08...22...09...28...03/24/92...ATLAS-1 12...49....46....07...23...15...03...07/31/92...TSS; EURECA deployment 13...66....66....10...22...34...02...11/03/94...ATLAS-3 14...69....71....09...19...22...17...06/27/95...Mir Docking No. 1 15...73....74....08...04...30...46...11/12/95...Mir Docking No. 2 16...76....76....09...05...15...53...03/22/96...Mir Docking No. 3 17...79....79....10...03...19...28...09/16/96...Mir Docking No. 4 18...81....81....10...04...55...21...01/12/97...Mir Docking No. 5 19...84....84....09...05...19...56...05/15/97...Mir Docking No. 6 20...87....86....10...19...20...50...09/25/97...Mir Docking No. 7 21...98....101...09...20...09...08...05/19/00...ISS 2A.2a (Zarya refurb) 22...99....106...11...19...11...01...09/08/00...ISS 2A.2b (outfitting) 23...102...98....12...21...20...03...02/07/01...ISS 5A (Destiny lab module) 24...105...104...12...18...34...56...07/12/01...ISS 7A (Airlock module) 25...109...110...10...19...42...38...04/08/02...ISS 8A (S0 truss) 26...111...112...10...19...57...49...10/07/02...ISS 9A (S1 truss) 27...116...115...11...19...06...35...09/09/06...ISS 12A (P3/P4 truss) 28...118...117...13...20...11...34...06/08/07...ISS-13A (S3/S4) 29...121...122...12...18...21...40...02/07/08...ISS-1E (Columbus) 30...126...125...12...21...37...09...05/11/09...HST-SM4 31...129...129...10...19...16...13...11/16/09...ISS-ULF3 32...132...132...11...18...28...02...05/14/10...ISS-ULF4 (MRM-1) Vehicle Total...282...00...00...28
STS-135 COUNTDOWN SUMMARY TIMELINE
Editor's Note: Updated 06/13/11
The launch window is roughly 10 minutes long. To maximize ascent performance, NASA targets the middle of the window. A final hold in the countdown at the T-minus nine-minute mark will be extended as required to hit the desired launch time.
HH...MM...SS...EDT...........EVENT Tue 07/05/11 ...............12:30 PM......Call to stations 70...21...00...01:00 PM......Countdown begins 60...21...00...11:00 PM......Fuel cell reactant load preps Wed 07/06/11 54...51...00...04:30 AM......MEC/SRB power up 54...21...00...05:00 AM......Clear crew module 54...21...00...05:00 AM......Begin 4-hour built-in hold 54...21...00...05:00 AM......Clear blast danger area 53...36...00...05:45 AM......Orbiter pyro-initiator controller test 53...26...00...05:55 AM......SRB PIC test 52...26...00...06:55 AM......Master events controller pre-flight BITE test 50...21...00...09:00 AM......Resume countdown 48...51...00...10:30 AM......Fuel cell oxygen loading begins 46...21...00...01:00 PM......Fuel cell oxygen load complete 46...21...00...01:00 PM......Fuel cell hydrogen loading begins 43...51...00...03:30 PM......Fuel cell hydrogen loading complete 42...51...00...04:30 PM......Pad open; ingress white room 42...21...00...05:00 PM......Begin 4-hour built-in hold 41...51...00...05:30 PM......OMBUU demate 41...21...00...06:00 PM......Crew module clean and vacuum 39...21...00...08:00 PM......Remove APU vent covers 38...51...00...08:30 PM......MPS 2000 PSI test 38...21...00...09:00 PM......Countdown resumes 38...21...00...09:00 PM......Main engine preps 38...21...00...09:00 PM......MECs 1 and 2 on; avionics system checkout Thu 07/07/11 35...21...00...12:00 AM......LO2/LH2 feedline inspection 31...51...00...03:30 AM......Deflate RSS dock seals; tile inspection 31...21...00...04:00 AM......Tile inspection 30...56...00...04:25 AM......TSM prepped for fueling 30...21...00...05:00 AM......Begin 14-hour 6-minute hold 27...51...00...07:30 AM......RSS rotation preps 27...51...00...07:30 AM......OIS communications check with JSC 27...36...00...07:45 AM......Crew weather briefing 27...01...00...08:20 AM......JSC flight control team on station 26...21...00...09:00 AM......L-1 engineering briefing 25...51...00...09:30 AM......Comm activation 25...21...00...10:00 AM......Crew module voice checks 24...21...00...11:00 AM......Flight crew equipment late stow 21...21...00...02:00 PM......RSS to park position 21...21...00...02:00 PM......Ascent switch list 20...21...00...03:00 PM......Final TPS, debris inspection 16...20...00...07:01 PM......Resume countdown 16...00...00...07:21 PM......Pad clear of non-essential personnel 16...00...00...07:21 PM......APU bite test 15...10...00...08:11 PM......Fuel cell activation 14...20...00...09:01 PM......Booster joint heater activation 13...50...00...09:31 PM......MEC pre-flight bite test 13...35...00...09:46 PM......Tanking weather update 12...50...00...10:31 PM......Final fueling preps; launch area clear 12...20...00...11:01 PM......Red crew assembled 11...35...00...11:46 PM......Fuel cell integrity checks complete Fri 07/08/11 11...20...00...12:01 AM......Begin 2-hour built-in hold (T-minus 6 hours) 11...10...00...12:11 AM......Safe-and-arm PIC test 10...32...00...12:49 AM......Crew wakeup 10...20...00...01:01 AM......External tank ready for loading 10...02...00...01:19 AM......Mission management team tanking meeting 09...31...00...01:50 AM......NASA TV fueling coverage begins 09...20...00...02:01 AM......Resume countdown (T-minus 6 hours) 09...20...00...02:01 AM......LO2, LH2 transfer line chilldown 09...10...00...02:11 AM......Main propulsion system chill down 09...10...00...02:11 AM......LH2 slow fill 08...40...00...02:41 AM......LO2 slow fill 08...35...00...02:46 AM......Hydrogen ECO sensors go wet 08...30...00...02:51 AM......LO2 fast fill 08...20...00...03:01 AM......LH2 fast fill 06...25...00...04:56 AM......LH2 topping 06...20...00...05:01 AM......LH2 replenish 06...20...00...05:01 AM......LO2 replenish 06...20...00...05:01 AM......Begin 2-hour 30-minute built-in hold (T-minus 3 hours) 06...20...00...05:01 AM......Closeout crew to white room 06...20...00...05:01 AM......External tank in stable replenish mode 06...17...00...05:04 AM......Ascent flight control team on console 06...05...00...05:16 AM......Astronaut support personnel comm checks 05...35...00...05:46 AM......Pre-ingress switch reconfig 04...51...00...06:30 AM......NASA TV launch coverage begins 04...25...00...06:56 AM......Final crew weather briefing 04...15...00...07:06 AM......Crew suit up begins 03...50...00...07:31 AM......Resume countdown (T-minus 3 hours) 03...45...00...07:36 AM......Crew departs O&C building 03...15...00...08:06 AM......Crew ingress 02...25...00...08:56 AM......Astronaut comm checks 02...00...00...09:21 AM......Hatch closure 01...30...00...09:51 AM......White room closeout 01...10...00...10:11 AM......Begin 10-minute built-in hold (T-minus 20m) 01...00...00...10:21 AM......NASA test director countdown briefing 01...00...00...10:21 AM......Resume countdown (T-minus 20m) 00...59...00...10:22 AM......Backup flight computer to OPS 1 00...55...00...10:26 AM......KSC area clear to launch 00...49...00...10:32 AM......Begin final built-in hold (T-minus 9m) 00...24...00...10:57 AM......NTD launch status verification 00...09...00...11:17:46 AM...Resume countdown (T-minus 9m) 00...07...30...11:19:16 AM...Orbiter access arm retraction 00...05...00...11:21:46 AM...Launch window opens 00...05...00...11:21:46 AM...Hydraulic power system (APU) start 00...04...55...11:21:51 AM...Terminate LO2 replenish 00...04...00...11:22:46 AM...Purge sequence 4 hydraulic test 00...04...00...11:22:46 AM...IMUs to inertial 00...03...55...11:22:51 AM...Aerosurface profile 00...03...30...11:23:16 AM...Main engine steering test 00...02...55...11:23:51 AM...LO2 tank pressurization 00...02...35...11:24:11 AM...Fuel cells to internal reactants 00...02...30...11:24:16 AM...Clear caution-and-warning memory 00...02...00...11:24:46 AM...Crew closes visors 00...01...57...11:24:49 AM...LH2 tank pressurization 00...00...50...11:25:56 AM...SRB joint heater deactivation .............................HOLD due GOX vent arm false lock indication 00...00...31...11:28:33 AM...Shuttle GPCs take control of countdown 00...00...21...11:28:43 AM...SRB steering test 00...00...07...11:28:57 AM...Main engine start (T-6.6 seconds) 00...00...00...11:29:04 AM...SRB ignition (ACTUAL)
Editor's Note...
Posted: 10:20 PM, 07/08/11 - Updated to reflect actual launch time (includes Earth's rotation).
EDT...........T+........EVENT.......................VELOCITY inertial:..MPH RETURN TO LAUNCH SITE (RTLS) ONLY 11:29:04 AM...T+00:00...LAUNCH 11:29:15 AM...T+00:11...START ROLL MANEUVER.............................927 11:29:22 AM...T+00:18...END ROLL MANEUVER.............................1,002 11:29:36 AM...T+00:32...START THROTTLE DOWN (72%).....................1,200 11:29:53 AM...T+00:49...START THROTTLE UP (104.5%)....................1,432 11:30:05 AM...T+01:01...MAX Q (744 psf)...............................1,650 11:31:07 AM...T+02:03...SRB STAGING...................................3,627 11:31:17 AM...T+02:13...START OMS ASSIST (1:23 duration)..............3,743 TRANS-ATLANTIC LANDING (TAL) AVAILABLE 11:31:35 AM...T+02:31...2E TAL MORON (104.5%, 2s).....................3,955 11:31:40 AM...T+02:36...2E TAL ZARAGOZA (104.5%, 2s)..................4,023 11:31:50 AM...T+02:46...2E TAL ISTRES (104.5%, 2s)....................4,159 11:32:59 AM...T+03:55...NEGATIVE RETURN (KSC) (104.5%, 3s)............5,523 ABORT TO ORBIT AVAILABLE (ATO) 11:34:00 AM...T+04:56...PRESS TO ATO (104.5%, 2s, 157 u/s)............7,159 11:34:26 AM...T+05:22...DROOP ZARAGOZA (109%,0s)......................8,114 11:34:32 AM...T+05:28...ROLL TO HEADS UP..............................8,318 11:34:34 AM...T+05:30...1E OPS-3 ZARAGOZA (109%,0s,2EO SIMO)..........8,386 11:35:08 AM...T+06:04...1E TAL ZARAGOZA (104.5%,2s,2EO SIMO)..........9,614 PLANNED ORBIT AVAILABLE WITH ONE ENGINE OUT 11:35:13 AM...T+06:09...PRESS TO MECO (104.5%, 2s, 180 fps u/s).......9,818 11:35:13 AM...T+06:09...1E TAL MORON(109%,0s,2EO SEQ,1st EO @VI).....11,045 11:35:13 AM...T+06:09...1E TAL ISTRES (109%,0s,2EO SEQ,1st EO @VI)...11,386 11:35:56 AM...T+06:52...1E PRESS-TO-MECO (104.5%, 2s, 672 u/s).......11,864 11:36:24 AM...T+07:20...NEGATIVE MORON (2@67%).......................13,500 11:36:45 AM...T+07:41...LAST 2E PRE-MECO TAL ZARAGOZA (67%)..........14,864 11:36:45 AM...T+07:41...NEGATIVE ISTRES (2@67%)......................14,864 11:36:52 AM...T+07:48...LAST 1E PRE-MECO TAL ZARAGOZA (104.5%).......15,341 11:36:58 AM...T+07:54...23K..........................................15,682 11:36:58 AM...T+07:54...LAST 3E PRE-MECO TAL ZARAGOZA (67%)..........15,682 11:37:22 AM...T+08:18...LAST TAL DIEGO GARCIA........................17,182 11:37:28 AM...T+08:24...MECO COMMANDED...............................17,536 11:37:34 AM...T+08:30...ZERO THRUST..................................17,605
Editor's Note...
Updated: 06/17/11; Vel (e) is Earth relative; Vel (i) is inertial (includes Earth's rotation)
MM:SS...Thrust....Alt....Alt....Mach......Vel (e)...Vel (i)..Acc.....Range ........(%).......(ft)...(miles)..........(mph).....(mph)....(Gs)....(miles) 00:00...100.0......-23....0.0...0.0.........0.0.....914.4....0.3.....0.0 00:10...104.5......789....0.1...0.2.......126.8.....922.6....1.7.....0.0 00:20...104.5....4,051....0.8...0.4.......310.2...1,030.3....1.9.....0.1 00:30...104.5....9,320....1.8...0.7.......495.7...1,168.1....1.8.....0.5 00:40...72.0....17,442....3.3...0.9.......674.3...1,317.4....1.7.....1.1 00:50...83.0....26,404....5.0...1.1.......812.7...1,446.3....1.7.....2.0 01:00...104.5...36,851....7.0...1.5.......993.4...1,610.6....2.1.....3.2 01:10...104.5...50,708....9.6...2.0.....1,262.0...1,866.3....2.3.....4.9 01:20...104.5...65,730...12.4...2.4.....1,583.8...2,190.9....2.5.....7.1 01:30...104.5...84,751...16.1...3.0.....1,979.3...2,598.6....2.5....10.3 01:40...104.5..103,916...19.7...3.5.....2,358.3...2,989.4....2.5....14.2 01:50...104.5..126,608...24.0...3.9.....2,769.5...3,413.5....2.1....19.6 02:00...104.5..147,698...28.0...4.1.....2,942.6...3,599.6....0.9....25.2 02:10...104.5..168,477...31.9...4.2.....3,037.4...3,706.7....1.0....31.5 02:20...104.5..187,483...35.5...4.5.....3,151.3...3,832.8....1.0....37.9 02:30...104.5..207,103...39.2...4.8.....3,292.4...3,984.9....1.0....45.3 02:40...104.5..223,768...42.4...5.2.....3,433.5...4,133.6....1.1....52.5 02:50...104.5..240,825...45.6...5.7.....3,601.3...4,308.8....1.1....61.0 03:00...104.5..255,191...48.3...6.0.....3,766.3...4,478.6....1.1....69.1 03:10...104.5..269,763...51.1...6.4.....3,959.9...4,676.3....1.1....78.5 03:20...104.5..281,914...53.4...6.8.....4,146.7...4,865.9....1.2....87.5 03:30...104.5..293,043...55.5...7.2.....4,343.7...5,064.3....1.2....97.1 03:40...104.5..304,131...57.6...7.4.....4,572.2...5,294.1....1.2...108.1 03:50...104.5..313,188...59.3...7.6.....4,790.3...5,512.3....1.2...118.7 04:00...104.5..322,050...61.0...7.8.....5,039.2...5,761.2....1.3...131.0 04:10...104.5..329,147...62.3...8.1.....5,276.5...5,997.1....1.3...142.7 04:20...104.5..335,358...63.5...8.3.....5,523.3...6,243.3....1.4...155.0 04:30...104.5..341,201...64.6...8.5.....5,807.6...6,525.6....1.4...169.1 04:40...104.5..345,645...65.5...8.8.....6,076.9...6,793.6....1.4...182.7 04:50...104.5..349,615...66.2...9.1.....6,386.4...7,100.4....1.5...198.3 05:00...104.5..352,427...66.7...9.5.....6,679.6...7,391.6....1.5...213.1 05:10...104.5..354,693...67.2...9.9.....7,016.4...7,725.7....1.6...230.3 05:20...104.5..356,043...67.4...10.3....7,336.2...8,042.8....1.7...246.7 05:30...104.5..356,760...67.6...10.7....7,668.9...8,373.5....1.7...263.7 05:40...104.5..356,868...67.6...11.3....8,052.1...8,753.3....1.8...283.4 05:50...104.5..356,402...67.5...11.8....8,416.1...9,114.7....1.9...302.2 06:00...104.5..355,347...67.3...12.4....8,835.4...9,529.9....1.9...323.8 06:10...104.5..354,036...67.1...13.0....9,232.3...9,924.7....2.0...344.4 06:20...104.5..352,516...66.8...13.7....9,648.2...10,337.3...2.1...365.9 06:30...104.5..350,609...66.4...14.4...10,132.9...10,818.7...2.2...390.7 06:40...104.5..348,605...66.0...15.2...10,597.9...11,280.3...2.3...414.3 06:50...104.5..346,208...65.6...16.1...11,137.9...11,817.0...2.5...441.5 07:00...104.5..343,967...65.1...17.0...11,658.1...12,333.8...2.6...467.5 07:10...104.5..341,590...64.7...18.0...12,264.9...12,937.3...2.8...497.4 07:20...104.5..339,647...64.3...19.0...12,852.6...13,521.7...2.9...526.0 07:30...99.0...338,069...64.0...20.0...13,464.2...14,129.2...3.0...556.0 07:40...92.0...336,892...63.8...21.0...14,137.8...14,799.5...3.0...590.6 07:50...87.0...336,420...63.7...22.0...14,751.4...15,410.5...3.0...623.5 08:00...81.0...336,702...63.8...23.0...15,426.4...16,081.4...3.0...661.3 08:10...76.0...337,831...64.0...23.8...16,040.0...16,693.1...3.0...697.1 08:20...67.0...340,060...64.4...24.6...16,681.6...17,332.0...2.8...736.9 08:30...67.0...343,141...65.0...24.7...16,953.6...17,602.7...0.0...776.6 08:31...67.0...343,451...65.0...24.7...16,953.6...17,603.4...0.0...780.5
Editor's Note...
Updated: 07/08/11
DATE/EDT...DD...HH...MM...SS...EVENT 7/8 11:29 AM...00...00...00...00...STS-134 launch 12:06 PM...00...00...37...48...OMS-2 orbit adjust 03:09 PM...00...03...40...22...NC-1 rendezvous rocket firing 7/9 06:11 AM...00...18...42...02...NC-2 rendezvous rocket firing 05:27 PM...01...05...58...19...NC-3 rendezvous rocket firing 7/10 06:13 AM...01...18...44...52...DOR NH rendezvous rocket firing 07:01 AM...01...19...32...22...NC-4 rendezvous rocket firing 08:29 AM...01...21...00...00...TI burn 09:45 AM...01...22...16...54...MC-4 rendezvous rocket firing 11:07 AM...01...23...38...07...Docking 7/18 02:02 AM...09...14...33...00...Undocking 03:24 AM...09...15...55...00...Separation burn No. 1 03:52 AM...09...16...23...00...Separation burn No. 2 7/19 12:37 AM...10...13...08...44...Separation burn No. 3 03:14 AM...10...15...45...00...Picosat deploy 7/20 06:05 AM...11...18...36...00...Deorbit ignition 05:31 AM...11...18...02...00...Landing
Editor's Note...
Updated: 07/09/11
EDT........DD...HH...MM...SS...EVENT 07/10 07:01 AM...01...19...32...22...NC-4 rendezvous rocket firing 08:29 AM...01...21...00...00...Ti 09:05 AM...01...21...36...00...Sunset 09:27 AM...01...21...58...36...Range = 10,000 ft 09:36 AM...01...22...07...16...Range = 5,000 ft 09:39 AM...01...22...10...53...Sunrise 09:41 AM...01...22...12...45...Range = 3,000 ft 09:45 AM...01...22...16...54...MC-4 burn 09:49 AM...01...22...20...00...Begin final approach timeline 09:49 AM...01...22...20...54...Range = 1,500 ft 09:52 AM...01...22...23...36...RPM Start Window Open 09:54 AM...01...22...25...54...Range = 1,000 ft 09:57 AM...01...22...28...54...KU to LO (800 ft) 09:58 AM...01...22...29...54...Shuttle directly below station (725 ft) 10:04 AM...01...22...35...06...Range = 600 ft 10:06 AM...01...22...37...00...Start pitch maneuver 10:08 AM...01...22...39...38...Noon 10:14 AM...01...22...45...00...End pitch maneuver 10:16 AM...01...22...47...36...Initiate pitch up to velocity vector (575 ft) 10:16 AM...01...22...47...40...RPM full photo window close 10:25 AM...01...22...56...10...RPM start window close 10:28 AM...01...22...59...06...Shuttle directly in front of station (310 ft) 10:29 AM...01...22...59...56...Range = 300 ft 10:33 AM...01...23...04...06...Range = 250 ft 10:37 AM...01...23...08...16...Range = 200 ft 10:37 AM...01...23...08...23...Sunset 10:39 AM...01...23...10...46...Range = 170 ft 10:41 AM...01...23...12...26...Range = 150 ft 10:45 AM...01...23...16...36...Range = 100 ft 10:48 AM...01...23...19...36...Range = 75 ft 10:52 AM...01...23...23...46...Range = 50 ft 10:56 AM...01...23...27...06...Range (30 ft) -- start stationkeeping 11:01 AM...01...23...32...06...Push to dock 11:05 AM...01...23...36...26...Range = 10 ft 11:07 AM...01...23...38...07...DOCKING 11:12 AM...01...23...43...15...Sunrise
STS-135 ISS UNDOCKING TIMELINE
Editor's Note...
Updated: 07/16/11
EDT............DD...HH...MM...SS...EVENT 07/19 Tue 01:56 AM...10...14...27...34...Noon Tue 02:23 AM...10...14...53...56...Russian solar arrays feathered Tue 02:25 AM...10...14...56...15...Sunset Tue 02:28 AM...10...14...59...00...UNDOCKING Tue 02:28 AM...10...14...59...05...Maintain corrider Tue 02:29 AM...10...15...00...00...Initial separation Tue 02:29 AM...10...15...00...40...ISS holds attitude Tue 02:33 AM...10...15...04...00...Range: 50 ft: reselect -X jets Tue 02:35 AM...10...15...06...00...Range: 75 ft: Low-Z jets Tue 02:46 AM...10...15...17...00...Range: 250 ft Tue 02:50 AM...10...15...21...00...Range: 400 ft Tue 03:00 AM...10...15...31...00...Range: 600 feet; begin stationkeeping Tue 03:00 AM...10...15...31...00...ISS start maneuver to +YVV flyaround attitude Tue 03:00 AM...10...15...31...12...Sunrise Tue 03:27 AM...10...15...57...56...ISS in +YVV flyaround attitude Tue 03:27 AM...10...15...58...00...Shuttle starts half-lap flyaround Tue 03:28 AM...10...15...59...53...Noon Tue 03:38 AM...10...16...09...31...Shuttle directly above ISS Tue 03:50 AM...10...16...21...02...Shuttle directly behind ISS Tue 03:50 AM...10...16...21...03...Separation burn No. 1 (1.5 fps +X radial burn) Tue 03:50 AM...10...16...21...03...ISS start maneuver to normal attitude Tue 03:57 AM...10...16...28...34...Sunset Tue 04:17 AM...10...16...47...56...ISS in normal attitude Tue 04:18 AM...10...16...49...03...Separation burn No. 2 (10.0 fps -X retrograde burn)
Editor's Note...
Editor's Note...
Source: Space Track
Predicted space shuttle 2-line elements
Editor's Note....
Space Transportation System
Updated: 07/20/11; in EDT
ORBIT...SITE...DEORBIT BURN...LANDING/SITE
07/21 (nominal end of mission)
200.....KSC....04:49:04 AM...05:56:58 AM
201.....KSC....06:25:44 AM...07:32:55 AM
07/22 (EOM+1)
215.....KSC....03:51:00 AM...04:56:00 AM
216.....KSC....05:28:00 AM...06:31:00 AM
217.....EDW....06:58:00 AM...08:02:00 AM
........NOR....07:00:00 AM...08:04:00 AM
218.....EDW....08:35:00 AM...09:38:00 AM
........NOR....08:37:00 AM...09:40:00 AM
219.....EDW....10:12:00 AM...11:15:00 AM
07/23 (EOM+2)
231.....KSC....04:26:00 AM...05:30:00 AM
232.....NOR....05:59:00 AM...07:03:00 AM
........KSC....06:03:00 AM...07:06:00 AM
233.....EDW....07:33:00 AM...08:37:00 AM
........NOR....07:35:00 AM...08:39:00 AM
234.....EDW....09:10:00 AM...10:13:00 AM
236.....KSC....11:34:00 AM...01:36:00 PM *
* Descending node entry
Updated: 07/20/11
Rev. 200 deorbit to KSC (07/21/11)
Deorbit dT: 3:17
Deorbit dV: 223 mph
EDT...........EVENT
12:49 AM......Begin deorbit timeline
01:04 AM......Radiator stow
01:14 AM......Astronaut seat installation
01:20 AM......Computers set for deorbit prep
01:24 AM......Hydraulic system configuration
01:49 AM......Flash evaporator cooling system checks
01:55 AM......Final payload deactivation
02:09 AM......Payload bay doors closed
02:19 AM......Mission control 'go' for OPS-3
02:29 AM......OPS-3 transition
02:54 AM......Entry switchlist verification
03:04 AM......Deorbit PAD update
03:09 AM......Crew entry review
03:24 AM......CDR/PLT don entry suits
03:41 AM......IMU alignment
03:49 AM......CDR/PLT strap in; MS suit don
04:06 AM......Shuttle steering check
04:09 AM......Hydraulic system prestart
04:16 AM......Toilet deactivation
04:29 AM......MCC 'go' for deorbit burn
04:35 AM......MS seat ingress
04:44 AM......Single APU start
04:49:04 AM...Deorbit ignition
04:52:21 AM...Deorbit burn complete
05:24:50 AM...Entry interface
05:29:45 AM...1st roll command to left
05:41:13 AM...1st roll left to right
05:43:58 AM...C-band radar acquisition
05:50:12 AM...Velocity less than mach 2.5
05:52:22 AM...Velocity less than mach 1
05:53:11 AM...Left turn to runway 15
05:56:58 AM...Landing
(Source: NASA)
Rev. 201 deorbit to KSC (07/21/11)
Deorbit dT: 03:17
Deorbit dV: 223 mph
06:05 AM......MCC 'go' for deorbit burn
06:11 AM......MS seat ingress
06:20 AM......Single APU start
06:25:44 AM...Deorbit ignition
06:29:01 AM...Deorbit burn complete
07:00:44 AM...Entry interface
07:05:38 AM...1st roll command to left
07:17:57 AM...1st left to right roll reversal
07:19:55 AM...C-band radar acquisition
07:26:05 AM...Velocity less than mach 2.5
07:28:16 AM...Velocity less than mach 1
07:28:46 AM...Left turn to runway 15
07:32:55 AM...Landing
(Source: NASA)
Alternate Source: CelesTrak
The Shuttle Reference Manual provides a wealth of data about shuttle systems and procedures. Contents:
Orbiter Manufacturing and Assembly
Operational Improvements And Modifications
Solid Rocket Boosters
External Tank
Orbiter Structure
Orbiter Passive Thermal Control
Orbiter Purge, Vent and Drain System
Orbiter Flight Crew Escape Systems
Crew Equipment
Space Shuttle Orbiter Systems
Mission Events Summary
Displays And Controls
Space Transportation System Payloads
NASA Centers and Responsibilities
Orbiter Approach And Landing Test Program
Space Shutle Chronology through 1988
1998 Update: Space Shuttle Overview
1998 Update: Mission Preparation And Pre-Launch Operations
1998 Update: Launch And Flight Operations
1998 Update: Landing, Post-Landing And SRB Retrieval Operations
1998 Update: Space Shuttle Program Management